Complete grid connection services through all voltage ranges up to 132,000V.
Beaumont Infrastructure is an accredited Independent Connection Provider (ICP) offering contestable works up to 132kV. We manage the complete grid connection process from initial application, design, construction and commissioning through to final energisation and adoption by the Distribution Network Operator.
Our in-house teams have the expertise and accreditations to deliver grid connections across all voltage ranges, providing a single point of responsibility for what can be a complex and time-critical process.
From initial feasibility through to final energisation, our experienced teams manage every stage of the grid connection process, ensuring your project is connected on time and within budget.
Preparation and submission of Electricity Networks Association applications on your behalf, managing the application process with Distribution Network Operators to secure your grid connection offer.
Comprehensive feasibility assessments evaluating connection options, route surveys, and technical viability to identify the most cost-effective and practical grid connection solution for your project.
Full electrical design services including cable sizing, protection grading, earthing design, and system studies. All designs are developed to meet DNO standards and best practice requirements.
Expert cable installation services across all voltage ranges. Our qualified cable jointers and installation teams handle everything from trench excavation and duct installation through to cable pulling, jointing and termination.
Complete substation design and build services from compact package substations through to large outdoor switchyards. Including civil works, switchgear installation, transformer installation and all associated equipment.
Comprehensive testing and commissioning of all grid connection assets prior to energisation. Including cable testing, switchgear testing, protection relay testing, earthing verification and witnessed SAT procedures.
As your Independent Connection Provider, Beaumont Infrastructure manages the entire grid connection journey. We coordinate with Distribution Network Operators, local authorities, and landowners to deliver your connection efficiently and on programme.
ENA application submission, connection offer review and acceptance on your behalf.
Detailed electrical design, route planning and DNO design approval process.
Cable installation, substation build and all associated civil and electrical works.
Testing, commissioning, DNO adoption and final energisation of your connection.
Contact our grid connections team to discuss your requirements. We can provide initial feasibility advice and guide you through the connection process.